Munich, Germany
Plant site in the scenario: 16 Psyche, main asteroid belt
ScenarioEngineering
System · Digital twin

The project

Level 1 · MethodVirtual commissioning2 of 10 areas closed
186
real catalogue devices
1,937
PLC unit tests passed
113
live test stands against the PLC
10of 10
area scenes built in the twin
2of 10
areas virtually commissioned and closed
436
log entries, 419 of them plant faults found by the twin
Key topicsDigital twinVirtual commissioningReal-time 3D enginePhysicsDevice modelsPLC unit testsFault injection
05ScenarioEngineering

The project

1
Phase 1 Engineering

Concept and process design

The chain of 10 areas is set, and the mass balance closes within 1 %.

The deliverables
  • Basis of design
  • Process chain with mass balance
  • Timing of one batch
2
Phase 2 Engineering

Equipment selection

Every device is a current catalogue product. Large machines are black boxes with real connections.

The deliverables
  • Equipment catalogue with lifecycle evidence
  • Device gap analysis per area
  • List of black-box machines
3
Phase 3 Engineering

Control and safety design

Each area and vehicle gets one PLC and a safety concept. Handshakes are defined.

The deliverables
  • Control architecture
  • Signal list per area
  • Safety concept per area
4
Phase 4 Engineering

Device models

Each device is modelled from its datasheet and tested, 113 also live against the PLC.

The deliverables
  • 186 device models
  • 113 live test stands
  • Critical device reviews
5
Phase 5 Engineering

PLC programming

Device drivers are programmed and unit-tested. Each area has its own program, and most are already tested against their 3D scene.

The deliverables
  • Device library: 1,937 tests passed
  • PLC design per area
  • Area programs for all 10 areas
6
Phase 6 Engineering

Documentation

Each area has a full specification. Each product has a real device checklist.

The deliverables
  • Specification per area
  • Real device checklist, 2,528 items
7
Phase 7 Engineering

Virtual commissioning, area by area

The code is tested bottom-up: devices done, 2 areas closed, 4 areas in test.

The deliverables
  • Device level done
  • 10 of 10 area scenes built
  • 2 areas closed, 4 in test
  • Fault test per area
8
Phase 8 Scenario

Shipment and installation

In the story, the machinery flies to 16 Psyche and is installed area by area.

9
Phase 9 Scenario

Start of production

In the story, the real start-up needs only fine tuning, and the first ingots are cast.

The project

The project in numbers

10areas
process areas from ore to cargo
24machines
large machines as black boxes
113test stands
devices tested live against the PLC
2,528items
real device checklist items

The project scope

  • Process and logistics design: 10 areas, mass balance, racks, yard and tower.
  • Equipment: current catalogue products and 24 black-box machines.
  • Control, safety and digital twin: 14 PLCs, device models, virtual commissioning.
  • Not in scope: refinery internals, the cargo ship and the flight.